Door at top of stairs was hung |
Crawl space doors were hung |
Crawl space, closet and entrance doors were all hung in the upstairs bedrooms. |
Crown molding was put up |
As was the molding around the windows |
Shelving for shoes in largest of two closets |
Small rod in closet to hang long dresses |
Other side of closet with shelves and rods |
One of the saws that the contractors are using |
New shelves in linen closet in bathroom. Uh--oh, I thnk I forgot to tell them that the wall paper was supposed to go! I hope they can paint over it. |
Shelves in smaller closet. More will be added. Cabinets in the hall area were put back in. These had to be taken out when the tile was ripped out. |
1 comment:
Everything looks great! we went to put a new heater in our main building today and found rotten floor AGAIN! I renovated yucky floor all day.